
Berths
In 2000/2001, the decision to commence construction on the first of four phases was made. The first two phases are currently operational, with nine berths in total along a 3 km quayside. The first phase, which was in operation since 2005, can accommodate 2.2 million containers annually and includes 10 quay cranes. The second phase was opened in December 2006, comprising of an area of 72 hectares with 15 quay cranes.
The third phase, to be opened in stages, will be completed by 2010 with seven berths, with phase 3A to be opened in end 2007. When fully completed in 2012, the port will have four phases in operation with 30 berths capable of handling 15 million TEUs annually[1].

Cost
The total cost of Yangshan port may reach US$ 12 billion over 20 years [2]









