In May, 2000, the Ceará state government decided to reform the stadium. The reformations were divided in three parts, and started on May 16, 2001. The first part consisted in the recovery of the ditches, and of the bleachers junctions, as well as the recovery of the low walls. The second part of the reformation started on July 20, 2001, and consisted in the recovery and strengthen of the stadium physical structure. The third part consisted in the recovery of the electrical, hydraulic, sanitary and electronic installations.